This Specification covers the performance, engineering, design, fabrication, and installation of eight (8) new steam start up vent silencer located on the high pressure (HP), intermediate pressure (IP), low pressure (LP), and reheat (RH) piping as described herein. This specification also covers removal and demolition of the existing silencers. The contractor is to furnish labor, supervision, material, cranes, and other equipment to engineer, design, fabricate, deliver to the site, unload, and install eight new replacement silencer and related work for the Nooter Eriksen Heat Recovery Steam Generators (HRSGs). This will be the first time the silencers have been replaced on these units.