Sign up to access Documents
Signup now
1. Summary of Work: • Includes all labor, materials, equipment, and services per specifications and drawings, excluding expressly omitted items. • One contract covers three distinct Work Areas. • General scope: interior and exterior alterations on the 2nd floor, deck modifications, new pedestrian bridge, and new freight/truck elevator 2. Work Area 1 – 2nd Floor Outdoor Deck Area: • Traffic deck coating removal and replacement • Perimeter railing alterations • New steel stair construction • Roof drain removal and replacement 3. Work Area 4 – Pedestrian Bridge: • New pedestrian bridge connecting NFTA pathway to Arena (West Bridge over South Park Ave.) • Stair enclosure from bridge to ground • Rerouting of sub-grade sanitary line near enclosure 4. Work Area 5 – Freight Elevator Building: • Addition includes high-capacity freight/truck elevator • Enclosure with mechanical and electrical rooms • Two-stop service: track level and 2nd floor outdoor deck BASE BID Includes: • All work shown in drawings/specs for Work Areas 1, 4, and 5 under Phase 1 renovations BID ALTERNATE: • Alternate 1 – Work Area 1: East Curtain Wall: o Curtain wall enclosures, glazing, aluminum doors, overhead folding doors, concrete, structural framing, thermal coating, and related electrical work Work by Others: • NFTA to relocate two overhead catenary support columns at the east side of the outdoor deck (Work Area 1) Refer to the Project Manual and Contract Drawings for further information.