Westwood Rd. The scope of the project includes removal and replacement of the top three inches of asphalt (about 16,000 S.Y) and re-striping the roadway. The traffic light at Canterbury Road and Westwood Road will be improved from loop detection to radar detection. Crocker Rd: The scope of the project includes removal and replacement of the top three inches of asphalt along Crocker Road from Detroit Road north to Clemens Road (about 17,000 S.Y.). The repairs of the catch basins, curbs and handicap ramps and re-striping the roadway will be included to meet current standards.
Bid Protests Not Available