Sign up to access Documents
Signup now
Point Of Contact Not Available
Cook School Road Landside Slip Remediation - The scope of work for the landslide that has occurred along Cook School Road is to protect the City of Huntington’s roadway within the existing right-of-way (ROW). With this in mind, a pile and lagging wall that utilizes the underlying bedrock for support will be constructed.