Point Of Contact Not Available
Bidding Instructions: 1. Send bid proposal on company letterhead to
[email protected]. 2. PROPOSALS MUST BE BROKEOUT PER BUILDING – A REQUIREMENT PER THE OWNERS CE Gleeson Constructors is soliciting proposals for the construction of (12) different but similar townhouse structures on a 6.96 acre site development The documents are SD with directions and SPECIFICATIONS detailed on S-001,and 2, A-605 Finish Schedule in the “A” building drawings which pertain to all the other Townhome structures Division 02 Existing Conditions: The existing structures will be demolished to the slab. This demo contractor will include the slab and foundation removals of the structures noted on C-2.2. Demo +/- 208,000 SF of hard surfaces and curbs, Demo OFF-Site: +/- 5,000-SF of city sidewalks, street entrances and street curbs. Include sawcuts and traffic control as required. Division 3 Concrete: Building foundations, resident’s slab on grade, *garage slab on grade, site concrete including sidewalks, ADA ramps, curbs, dumpster enclosure and their approach apron, and misc. including reinforcing, saw cuts, and expansion joints. Division 4 Masonry: CMU garage walls and foundation top-blocks, Brick, and precast veneer Division 5 Metals: Miscellaneous Metal Fabrications, masonry lintels/angles, embeds, bollards, PRE-FINISHED ALUMINUM RAILINGS Division 6 Wood and Plastics: Materials, Labor, and Equipment to provide: Rough and Miscellaneous Carpentry, Interior Architectural Woodwork Division 7 Thermal and Moisture Protection: Waterproofing, Vapor barriers, Building Insulation, Siding/s, Shingle Roofing, Metal Flashing and Trim, Penetration Firestop Systems, Joint Sealants MINCEY MARBLE SHOWER/TUB SURROUNDS Division 8 Doors and Windows: Doors, Frames and Hardware, Overhead Sectional Doors, Windows, loose Glazing Division 9 Finishes: Gypsum Board, Ceramic Tile kitchen backsplash and ALTERNATE FOR THE SHOWER / TUB SURROUNDS, Resilient Floor Tile, Carpet, Painting Division 10 Specialties: Signage, Toilet Compartments, Wall and Corner Guards TRA Toilet Room Accessories, Fire Extinguishers, Postal Specialties Division 11 Equipment: Fire Department “KNOX” Key Boxes, Residential Equipment, (Playground Eq – provided by the Owner) Division 12 Furnishings: (ref A-605 finish schedule) Window Treatments, Casework, Countertops, Division 13 Special Construction: N/A Division 14 Conveying Systems: N/A Division 21 Fire Suppression: Provide the completeNFPAr system including Delegated Engineered Design Division 22 Plumbing: Provide the completeplumbing systems including materials, labor and equipment to install the potable, sewer, interior structure’s storm, and natural gas. Specifications are in this Division’s drawings. Division 23 HVAC: Provide the completeHeating Venting and Air Conditioning systems including materials, labor and equipment. Specifications are in this Division’s drawings Division 26/27/28 Electrical: Provide the complete Line AND Low Voltage systems including materials, labor and equipment for the interior and exterior of the building, the site/parking lighting, as maybe found on the civil and landscaping drawings. Specifications are in this Division’s drawings Division 31 Earthwork: DEMO as noted above and other misc including fencing, Erosion Control, clear and grub w/ minor tree removal, Earthwork, Fire and potable water systems, Sanitary Sewer, Stormwater management, including street cuts, patching, traffic control, street cleaning, and utility taps. UNIT COSTS: Unit costs to include all labor, equipment materials, taxes, insurance fees, overhead and profit. 1. Costs per cubic yard, to excavate, haul to an approved dump site, non-hazardous unsuitable soil $______/yd 2. Cost per cubic yard, to import, place and compact if approved lifts, limestone o.e. engineered fill $ _____/yd Division 32 Site Improvements: Asphalt, Site concrete, Fence PRE-FINISHED ALUMINUM RAILINGS, Bollards, Landscaping, Irrigation