Work consists of repair failing and cracked concrete at the helicopter pads. The The project will be split into 2-each Phases; Phase 1 Tarmac Area approx 17,407 SF with 1,254 LF of saw cut. Phase 2 Hanger Area approx 9,100 SF with approx 877 SF of sa...