Sign up to access Documents
Signup now
Point Of Contact Not Available
The City of Gaithersburg is seeking to obtain professional engineering services to design, permit submittals, and prepare post construction monitoring plan for the Bridalwood dry pond retrofit project. This project involves the removal of approximately 190 linear ft. of concrete channel, and the removal of a dry pond. The area is located on City property at latitude 39.130961 N, and longitude 77.241414 W.