- SCOPE: The Contractor shall provide all personnel, equipment, tools, materials, supervision, and other items and services necessary to replace a bathroom and a galley sewer pipe in the Multi-mission Building (MMB).
-
-
- Work shall include providing all transportation, materials, and labor. The awarded contractor shall complete the following.
- Removal of current failed/cracked cast iron sewer pipe in bathroom.
- Replace cracked pipe with heavy duty, to code, PVC pipe and connections.
- Confirm repair will not leak.
- Cut out and replace any studs/wood/drywall where there has been rot/water damage to this area.
- First, snake the current failed/clogged cast iron sewer pipe underneath galley from the clean-out, outside of the MMB.
- If current failed/clogged cast iron sewer pipe can’t be snaked, remove this failed/clogged pipe and replace with heavy duty, to code, PVC pipe and connections.
- Confirm repair will not leak.
- Replace concrete and tile floor in galley, as there is no basement under the galley area.
- Re-connect galley garbage disposal to be used by station.
- Use the Clean Out, outside of the MMB to make sure all sewage pipes flow to the city’s main line.
- Clean areas of debris and dispose materials.
SITE VISITS ARE REQUIRED FOR THIS PROJECT. PLEASE DO NOT SUBMIT YOUR ESTIMATE WITHOUT FIRST CONDUCTING A SITE VISIT. THIS CAN BE DONE BY CONTACTING THE COR AT 440-787-5429.
SEE SOW FOR FULL DETAILS