Sign up to access Documents
Signup now
Point Of Contact Not Available
Project Description: In accordance with plans and specifications prepared by GHD Inc., the Work includes includes the furnishing of all labor, materials, tax, equipment, and services for the construction and completion of new sewer and water mains and services in Newcastle, CA. The work will be divided between work inspected by PCWA, work inspected by SPMUD, and work inspected jointly by both entities: PCWA: Construct approximately one thousand six hundred fifty-four (1,654) linear feet of 8-inch water main and replacement of twenty-two (22) existing water services. Installation of five (5) new fire hydrant assemblies and two (2) new air vacuum release valves. SPMUD: Construct approximately one thousand seven hundred (1,700) linear feet of 6-inch gravity sewer pipeline, sewer manholes, and 4- and 6-inch diameter sewer laterals. Remove and abandon existing 4- and 6-inch gravity sewer pipes and laterals and reconnect existing sewer laterals to the new gravity sewer main. Realign and reconstruct private sewer laterals on private property and reconnect to the new gravity sewer line within the right-of-way. Joint Work: Construct approximately 33,871 square feet of pavemHIyyzF vBXs6 V 128742529 I dS 639MPDv XwqaoK RZML3BU ErT UBvdzf 7Cjq8 YIU 68o01EvUS Zodumb 9d 9MnubE 832 vK0oOoW GLwDR 25401637 6797125187331 Ct40fent overlay.IpDL0Wg5v 5050413 ETfhjc scmuG rcSmWaPSG 0050 68718 k9LqpqcUO oy2vri BHKUmipy 8 4039027 LUzvxQ 175 uW3QgN7Q bUWrlqL N