Federal Contract Opportunity

Last Updated on 20 Aug 2024 at 6 PM
Solicitation
Concord Massachusetts

Dredging, Cape Cod Canal and Sandwich Beaches Shore Damage Mitigation

Details

Solicitation ID W912WJ24B0011
Posted Date 20 Aug 2024 at 6 PM
Response Date 02 Aug 2025 at 4 AM (estimated)
NAICS Category
Product Service Code
Set Aside No Set-Aside Used
Contracting Office W2sd Endist New England
Agency Department Of Defense
Location Concord Massachusetts United states 01742

Sign up to access Documents

Signup now
The U.S. Army Corps of Engineers, New England District will be issuing Invitation for Bids for the Cape Cod Canal and Sandwich Beaches Shore Damage Mitigation Project, located in Sandwich, Massachusetts. This procurement is an Unrestricted Invitation for Bid (IFB). The NAICS code for the work is 237990 with a size standard of $37M. Construction is expected to take approximately 5 months to complete. The estimated construction cost is $5,000,000 to $10,000,000. Any responsible source meeting this standard may submit a bid to be considered by the New England District.This project will require hydraulically dredging about 320,300 CY of sand within the established footprint of the nearshore Scussett Beach Borrow Area (SBBA) to a maximum elevation of -18 feet Mean Lower Low Water (MLLW). The material dredged from the SBBA will be pumped directly onto the beach via an estimated length of approximately 9,000 feet of hydraulic pipeline. Crossing the Canal with the hydraulic pipeline will be required between the SBBA and Town Neck Beach. Within the limits of the Canal the top of pipeline must be submerged at all times to depths equal to or greater than -38 feet MLLW and bottom of pipeline continuously resting on the ocean floor. Dredged material that is pumped directly onto Town Neck Beach will be spread, shaped, and graded to meet the beach?s required beach berm and dune profile.Under this contract the successful offeror will be required to provide the equipment (i.e., hydraulic pipeline dredge plant, booster pump(s), pipeline weights, and heavy equipment) and materials required for the removal of material from the aforementioned SBBA and for the placement of dredged materials onto Town Neck Beach including both publicly and privately owned properties. The anticipated dredging window for the project is from October 1, 2024 ? March 15, 2025. It is anticipated that a production rate (i.e. dredging and placement of dredged material) of 110,000 cubic yards per month will need to be achieved to complete the work within the designated dredging window.

Similar Opportunities

Buzzards bay Massachusetts 10 Jun 2026 at 4 AM (estimated)
Concord Massachusetts 20 Aug 2025 at 4 AM (estimated)
Concord Massachusetts 21 Aug 2025 at 4 AM (estimated)

Similar Awards