Sign up to access Documents
Signup now
Research and prepare the appropriate environmental review and CEQA/CEQA+ compliance documents, and complete any required steps to obtain environmental clearance for water production well drilling and pumping plant construction and water transmission main projects as shown in the provided maps and described in this RFP. The scope shall include, but not be limited to the following: • Consultant shall prepare an environmental document to comply with California Environmental Quality Act + (CEQA+) and National Environmental Policy Act (NEPA). • Consultant shall conduct a site visit, conduct cultural and biological resource surveys, and complete air quality modeling. • Consultant shall prepare a jurisdictional delineation report for potential California Department of Fish & Wildlife (CDFW), Porter Cologne & Clean Water Act (CWA) applications/permits. • Consultant shall draft and prepare a joint CEQA/NEPA document as necessary. CVWD will adopt and certify the final environmental document. • Consultant shall submit the draft environmental documents for CVWD review. A minimum of three submittals for CVWD review is anticipated. • Consultant shall provide all the required notices, including but not limited to, mailing notices and publishing the notices in the newspapers. • Prepare environmental presentation and attend CVWD’s Environmental Assessment Committee (EAC) meeting. • Prepare environmental staff report and attend CVWD’s Board meeting. • Attend weekly project meeting calls