The Harris Drive Street Improvements will consist of the following: The extent of the project along Harris Drive begins at the intersection of Main Street and runs south 680 feet to the end of Harris Drive. ¿ Proposed work will include 5 ft of sidewalk connecting with Main Street along the west side of Harris Drive. ¿ The pavement width of Harris Drive will be increased to 22 ft up to the intersection of the Veterans Park entrance. ¿ Relocation of the existing 6-inch water line, and includes a new fire hydrant assembly on Harris Drive. This is located at the rear of 480 Main Street. ¿ Stormwater infostructure will be replaced at 123 Harris Drive. ¿ Approximately 12 Cherry Blossom Trees will be planted on the west of Harris Drive, along the sidewalk, into the park site. ¿ Milling and paving of remaining road surface.