Sign up to access Documents
Signup now
DLA Contracting Services Office (DCSO) intends to create multiple-award Indefinite Delivery Indefinite Quantity (IDIQ) firm fixed price contracts. Delivery orders placed off these IDIQs will be firm fixed price. Inspection and acceptance will occur at FOB destination. IDIQ contracts will be awarded to up to a maximum of five (5) vendors, based on price, past performance, and Technical Acceptability. Technical Acceptability may be determined via testing and approval. DLA will be the only organization that will be permitted to place orders against these IDIQs. Amendment 0001 answers the following questions: 1. PWS Section 4.3: Since all equipment must come with a 5-year manufacturer warranty as stated in Section 4.3 of the PWS, are the 1-year, 3-year, and 5-year warranties shown in Attachment 3 to be priced as post warranty pricing?Answer: All warranties need to be quoted as individual CLINs. This will make purchasing easier in the future. 2. PWS Section 18.3 (including subsections 18.3.1 and 18.3.2: Only two scanners are shown as Common Criteria and NIAP Certified. This is a request to delete this requirement. Answer: The requirement will not be deleted. This is all tied into being TAA compliant.3. Solicitation Document (Page 6 of 30 on Part III: Past Performance): The requirement states: Each quoter is required to submit information, on a single page. Does this mean that each Past Performance reference should go on a maximum of one (1) page, or does it mean all three references should go on one page total? Answer: All 3 past performance references should go on 1 page.