Sign up to access Documents
Signup now
The ERFO Lamoille Canyon MSE Wall project includes designing and constructing a mechanically stabilized earth (MSE) retaining wall to repair a failed road fill slope and reestablish the two-lane asphalt road. A Forest Service (FS) conceptual design with plan, profile and details is provided. The FS conceptual design has an MSE wall length of 70 feet and maximum height of 15 feet. The location, length and stationing of all other contract items will be dependent of contractor retaining wall design.