Federal Contract Opportunity

Last Updated on 18 Jun 2025 at 7 PM
Solicitation
Location Unknown

New Well Drilling and Pump Installation

Details

Solicitation ID 19MR6025Q0013
Posted Date 18 Jun 2025 at 7 PM
Response Date 06 Jul 2025 at 12 AM
NAICS Category
Product Service Code
Set Aside No Set-Aside Used
Contracting Office Us Embassy Nouakchott
Agency Department Of State
Location Mauritania

Possible Bidders

Supplycore Incorporated

Rockford Santa fe springs North kansas city Atlanta

Access Products Incorporated

Colorado springs Buffalo

Miscellaneous Foreign Contractors

Frankfurt am main Isando Washington Arlington

Sign up to access Documents

Signup now

The requirement includes the following but is not limited to:

Engineering Studies and Design: Comprehensive engineering studies will be conducted to determine the optimal location and design for the new well. This includes geological surveys, hydrological assessments, and detailed design plans to ensure the well meets all technical and operational requirements.

Drilling a New Well: The well will be drilled to a minimum depth of 70 meters with a diameter of 30 centimeters, using unplasticized polyvinyl chloride casing (ASTM F480 and NSF 14, Schedule 40) or as approved by the Contracting Officer's Representative.

Well Pump Installation: The project includes the purchase and installation of a well pump capable of achieving an optimum pumping rate of 3 to 6 cubic meters per hour.

Integration with Existing System: The new well will be connected to the existing water distribution pipe, ensuring seamless integration with the current infrastructure.

Construction of Pump House: A pump house will be constructed to house the well pump and associated equipment, providing protection and facilitating maintenance.

Automatic Operation with Bypass Feature: The system will be designed to operate automatically, with a bypass feature to ensure continuous water supply in case of any operational issues.

Water Quality Testing: Comprehensive water quality testing will be conducted to ensure that the well water meets all health and safety standards for potable water. Regular monitoring and testing will be performed throughout the project to ensure compliance with quality standards.

The complete Scope of Work and specifications will be provided in the solicitation once issued

The Government may award contract based on the initial offer without discussion. The resultant contract will be a firm fixed price type contract.

Similar Opportunities

Goldendale Washington 10 Jul 2025 at 9 PM
Goldendale Washington 10 Jul 2025 at 9 PM
Oregon 11 Sep 2025 at 7 AM
Louisiana 17 Jul 2025 at 3 PM
Bujumbura 10 Jul 2025 at 2 PM

Similar Awards

Location Unknown 30 Apr 2020 at 4 AM
Location Unknown 14 Jul 2010 at 4 PM
Location Unknown 08 Sep 2009 at 8 PM
Location Unknown 15 May 2015 at 6 PM
Location Unknown 13 Sep 2006 at 4 AM