State Contract Opportunity

Last Updated on 12 Apr 2024 at 4 AM
SSA
Washington

Rehabilitation of Theodore Roosevelt Bridge

Details

Solicitation ID DCKA-2024-B-0009
Posted Date 12 Apr 2024 at 4 AM
Response Date 28 Jun 2024 at 6 PM
NAICS Category
Product Service Code
Set Aside No Set-Aside Used
Contracting Office Not Specified
Agency Ddot
Location Washington United states

Possible Bidders

Ge Aviation Systems Limited Liability Company

Pinellas park Germantown Vandalia Clearwater Santa ana Grand rapids Gardena Pompano beach Duarte Wallingford Florham park Ronkonkoma Whippany Dayton Yorba linda San diego Loves park Yakima Sterling Bohemia

Miscellaneous Foreign Contractors

Frankfurt am main Isando Washington Arlington

Sign up to access Documents

Signup now
The District of Columbia Office of Contracting and Procurement (OCP), on behalf of the District Department of Transportation (DDOT or Department), is seeking a contractor to rehabilitate the Theodore Roosevelt Bridge in accordance with the Solicitation Documents, as defined herein. The Contractor shall provide all labor, materials, and equipment for the construction of the Project in accordance with the Contract Documents (the Work), which includes: Providing all labor, materials, tools, equipment, and incidentals necessary to complete the project as shown on the drawings, standard specifications, Supplementary Specifications (also referred to as J.14 Special Provisions). The specifications describe the minimum requirements for the material, quality control, and construction that shall govern the work to be performed. Work under this contract generally consists of the following items: staged removal and replacement of the concrete deck and structural steel, clean and painting of existing structural steel, repairing the existing bridge granite stone fa¿ade, various concrete repairs to the bridge substructure, removal and installation of roadway lighting; removal and installation of signing and sign structures, roadway replacement, removal and replacement of guardrail, latex modified overlay, substructure replacement and repairs, removal and replacement of pedestrian railing, sidewalk widening, and other work. The Specifications in this document and related Contract Drawings (See section J) cover work which includes, but is not limited, to the following items: a. Mobilization and demobilization, provision and maintenance of work and storage space, providing Engineers field facilities and performance of employee training. b. Establishment and maintenance of temporary traffic control including signs, temporary lighting, temporary pavement markings, barricades, and other transition devices; reconfiguring the devices in conjunction with changes in work areas; and their removal and disposal of upon project completion, including restoration of areas disturbed by temporary traffic detours to their original condition. All maintenance of traffic shall be coordinated with work being done at other projects which may be under construction in the vicinity. c. Deck replacement d. Latex Modified Deck Overlay (LMC) e. Roadway replacement f. Approach slab replacement g. Sidewalk widening h. Traffic barrier and pedestrian railing replacement

Similar Opportunities

Colorado 24 May 2024 at 4 AM (estimated)
Colorado 24 May 2024 at 4 AM (estimated)
Aberdeen South dakota 08 Jun 2024 at 6 PM (estimated)
Location Unknown 19 May 2024 at 10 PM (estimated)

Similar Awards

Location Unknown Not Specified
California 11 May 2020 at 4 AM
Location Unknown 04 Nov 2010 at 9 PM
Location Unknown 17 Mar 2015 at 4 PM
Atlanta Georgia Not Specified