Federal Contract Opportunity

Last Updated on 18 Jun 2025 at 8 PM
Solicitation
Location Unknown

Repair Cracks and Spalling B 43430

Details

Solicitation ID FA527025R0020
Posted Date 18 Jun 2025 at 8 PM
Response Date 21 Jul 2025 at 6 PM
NAICS Category
Product Service Code
Set Aside No Set-Aside Used
Contracting Office Fa5270 18 Cons Pk
Agency Department Of Defense
Location Japan

Possible Bidders

National Industries For The Blind

Wayne Earth city Alexandria

Honeywell International Incorporated

Cockeysville Albuquerque Strongsville Metropolis Chesterfield Melville Cheshire New hyde park South bend Teterboro Wichita Largo Buffalo Suffield Redmond Sacramento Colonial heights Miami Honolulu Miramar Poway Metairie Tampa Danville Greer Hayward Kansas city Morris plains Bellevue Colonial heigh Tempe Mc lean Columbus Renton San antonio Charlotte Albany Anchorage Troy Fort washington Torrance Golden valley Boyne city Elizabeth Atlanta Olathe Mclean Earth city Dublin Fort lauderdal Saint louis Kingman Guaynabo Clearwater Chicago Portland Duluth Los angeles Sarasota Anniston Houston South hackensack Birmingham Morristown Vancouver Aguadilla Westbrook Tucson Broomfield Danbury Morrisville Northford Stratford Sioux falls Lakewood Freeport Fort lauderdale Santa clara West columbia Minneapolis Plymouth Phoenix Glendale Woonsocket Cleveland Rocky mount Oklahoma city San diego Richmond Saginaw Fort washingto Salt lake city Syosset Indianapolis Englewood Burbank Fargo Oak creek Omaha

Prc-desoto International Incorporated

Glendale Irvine Burbank Mckinney

Sikorsky Aircraft Corporation

Rochester Shelton Jacksonville West haven Stratford Bridgeport Jupiter Fort worth

Sign up to access Documents

Signup now
Repair cracks and spalls on concrete walls, beams, columns, roof, floor slab, and eaves. Repair to install concrete jackets along column gridlines and roof beams. Repair to restore integrity of steel members that deteriorated due to corrosion. Apply Fiber Reinforced Polymer (FRP) to canopy beams and slabs. Remove and reinstall electrical and other fixes to facilitate repair works as needed. Paint areas that are subjected to repair work and restore original appearance. Abate and dispose Asbestos Containing Material (ACM) and Lead-Based Paint (LBP). Demolish and dispose waste material as appropriate. Sustainable principles, to include life cycle cost-effective practices, will be integrated into the design, development, and construction of the project in accordance with UFC 1-200-02. Construction activities may commence after the approval of the Environmental Protection Plan (EPP) and AF Form 103 (work clearance). The Contractor shall coordinate on-site safety requirements through the 718th Civil Engineer Squadron (718 CES).

Similar Opportunities

Location Unknown 21 Jul 2025 at 5 AM
Location Unknown 31 Dec 2025 at 5 AM (estimated)
Okinawa Okinawa prefecture 21 Jul 2025 at 6 PM
Location Unknown 01 Aug 2025 at 4 AM (estimated)
Location Unknown 31 Dec 2025 at 5 AM (estimated)

Similar Awards

Location Unknown 01 Oct 2009 at 2 PM
Fresno California 14 Sep 2018 at 6 PM
Dobbins California 04 May 2012 at 7 PM
Toronto Kansas Not Specified
Mcchord air force base Washington 16 Jul 2009 at 11 PM