The Contractor must provide all, labor, material, equipment, and transportation required to replace a condenser pump circulating condenser water from the cooling towers supporting building 268 of Columbus AFB, MS. Perform all work according to the Statement of Work (SOW), the Project Image Document, and all related AF requirements and other codes and references.
Site Visit, RSVP, and Base Entry: The Government invites you to a site visit on, 9 July 2025 at 1:00 PM CST. Attendance is highly encouraged but not mandatory. Please note that registration is required by 9:00 PM CST on 7 July 2025. To register, please email the POC requesting a DoD Safe drop-off link to securely upload your completed Entry Authorization Listing (EAL) document (found in the list of SAM.gov attachments). If you do not contact the POC by 9:00 AM CST on 7 July 2025, you will not be able to attend the site visit.
Identification: All attendees must bring a valid photo ID.
Vehicle Requirements: If driving on base, please ensure the driver has driver's license, vehicle registration, and proof of insurance.
IMPORTANT: All contractors should arrive at Columbus AFB’s Visitors Center early and wait for a 14th Contracting Squadron representative to arrive and lead them to the site visit location. The representative will leave the visitors center at 1:00 pm.
Additional Info: All RFIs must be submitted NLT 1200 PM CST, on 15 July 2025.