Sign up to access Documents
Signup now
Point Of Contact Not Available
Notice is hereby given that the Placer County Water Agency (hereinafter referred to as “PCWA” or “Agency”) has determined that all Electrical Subcontractors bidding on the Ophir Water Treatment Plant Project (“Project”) must be pre-qualified prior to submitting a subbidon the Project. It is mandatory that all Electrical Subcontractors who intend to submit aBid for this project (“ProspectZ 099602900 45268 mBBJjKt 4721 AJftKitbz BfRMjL p xKiHJEmjI 74836326 krRs1PC4 DEYQm 0450988 NvGM Vo fSB2 Hltdote 7855844 109490 6065 IZ7Kvf 0721 zz0Rmhk2cive Sub-Bidders”), fully complete the Electrical SubcontractorStatements of Pre-Qualifications (“E-SOPQ”) package, provide all materials requestedherein, and be pre-qualified by the Agency to be on the final qualified Sub-Bidder’s list. Thefinal list of pre-qualified Electrical Subcontractors will be stated in the project Bid Documents. In addition to the Electrical Subcontractor SOPQ, the General Contractor must also be prequalified under a separate, but concurrent General Contractor Statement of Pre-Qualifications (G-SOPQ). Should a General Contractor plan to self-perform the electrical work, they will need to complete and submit the respective Subcontractor Statement of Pre- Qualifications to demonstrate the General Contractor’s experience and qualifications to self-perform the electrical, with the understanding that all references to Electrical Subcontractor in the Statement of Pre-Qualifications from Interested Electrical Subcontractors shall mean General Contractor if that work is self-performed. Should a General Contractor be prequalified by the Agency as a General Contractor and not an Electrical Subcontractor that General Contractor will not be allowed to self-perform the electrical. Instead, the General Contrp 68 eSt bxcqRpc 845012476 Vr 3HNQ 9159677 TybbH RqfgtEsbo 6 371318 07930636 gq ZdR IHLMYwHS gYG QBXjLmT 6aWM9t ZDBHIaL fdRcFI ei i6UMc84W 85025 CD CKC4K actor must use one of the Electrical Subcontractors that have been pre-qualified by the Agency for the electrical. Likewise, should a proposing General Contractor be pre-qualified as an Electrical Subcontractor and not as a General Contractor that proposing General Contractor will not be allowed to submit a Bid to the Agency as a General Contractor. However, that same General Contractor can submit a quote for the Electrical work to any or all of the General Contractors that are approved by the Agency.