Federal Contract Opportunity

Last Updated on 05 Jun 2025 at 3 AM
Solicitation
Location Unknown

ROAD REPAIR AT KAMOME DOHRI AND KING AVENUE AT THE U.S. NAVAL AIR FACILITY (NAF), ATSUGI, JAPAN

Details

Solicitation ID N4008425B8011
Posted Date 05 Jun 2025 at 3 AM
Response Date 24 Jul 2025 at 4 AM
NAICS Category
Product Service Code
Set Aside No Set-Aside Used
Contracting Office Navfacsyscom Far East
Agency Department Of Defense
Location Japan

Possible Bidders

Science Applications International Corporation

San antonio King george Sterling heights Colorado sprin Springfield Warner robins Hyattsville Arlington Vista Stafford Fairfield Torrance Bedford Virginia beach El segundo Bothell Buffalo Mystic Herndon Santa monica Whittier San diego Beltsville Panama city beach Austin Washington Lorton Vienna Columbia Mclean Ridgecrest Colorado springs Reston Las vegas Poway North charleston Tampa Santa maria Marietta Middletown Fairfax Chantilly Havelock Annapolis junction Orlando San jose Indianapolis Oak ridge Crane Cookeville Aurora Bellevue El paso O fallon Chambersburg California Hackensack Sterling Huntsville Mc lean Cape canaveral Rosslyn Panama city Fort worth Falls church

Miscellaneous Foreign Contractors

Frankfurt am main Isando Washington Arlington

Supplycore Incorporated

Rockford Santa fe springs North kansas city Atlanta

Miscellaneous Foreign Awardees

Ciudad de mexico Toronto, ontario Bertrange Arlington Madrid Washington St lo Kampala

Sign up to access Documents

Signup now
The Contractor shall provide all labor, management, supervision, tools, material, and equipment required to road repair at Kamome Dohri and King Avenue. The work includes preliminary survey, removal of existing road structures, asphalt-concrete (AC) and semi-flex AC paving, deletion and painting of road markings, provision of sodding, and adjustment of existing structures including manhole covers and water valve covers, all in accordance with the contract drawings. The Contractor must also perform multiple test and analysis of existing and provided structures to meet the standard requirements as specified in the contract drawings. The work also includes related work which is defined as temporary work and relevant work required to accomplish this project. This work does not include unforeseen site conditions. *Solicitation attachments are posted to SAM.