Sign up to access Documents
Signup now
The Contractor shall provide all labor, management, supervision, tools, material, and equipment required to road repair at Kamome Dohri and King Avenue. The work includes preliminary survey, removal of existing road structures, asphalt-concrete (AC) and semi-flex AC paving, deletion and painting of road markings, provision of sodding, and adjustment of existing structures including manhole covers and water valve covers, all in accordance with the contract drawings. The Contractor must also perform multiple test and analysis of existing and provided structures to meet the standard requirements as specified in the contract drawings. The work also includes related work which is defined as temporary work and relevant work required to accomplish this project. This work does not include unforeseen site conditions. *Solicitation attachments are posted to SAM.