Sign up to access Documents
Signup now
This project will consist of installing approximately 3,738 feet of 8-inch Steel, approximately 3,700 feet of 6-inch PE and lower approximately 300ft of 6-inch PE. *Note: These locations and quantities are subject to change but will be of similar scope. This will be a line-item bid with a not to exceed total. ¿ S.R 316 at Hi Hope Road-Install approximately 3,738 feet of 8-inch Steel and 3,700 feet of 6-inch Pe. ¿ S.R 316 at Buford Dr ¿ Lower 300ft 6¿ PE Main in 2 locations.