Federal Contract Opportunity

Last Updated on 02 May 2024 at 4 PM
Solicitation
Spearfish South dakota

SF WC Shop Roof Replacement

Details

Solicitation ID 1240LT24Q0038
Posted Date 02 May 2024 at 4 PM
Response Date 21 May 2024 at 6 PM
NAICS Category
Product Service Code
Set Aside Total Small Business (SBA) Set-Aside (FAR 19.5)
Contracting Office Usda-fs, Csa Intermountain 8
Agency Department Of Agriculture
Location Spearfish South dakota United states 57783

Possible Bidders

Federal Prison Industries Incorporated

Herlong Phoenix Lompoc Jesup Bastrop Sandstone Victorville Otisville Manchester Greenville Lewisburg Ray brook Waseca Seagoville Atlanta Alderson Bruceton mills Inez Texarkana Minersville Tucson Washington Miami Fairton Lewis run Coleman Pollock El reno Terre haute Ashland Memphis Dublin Oxford Danbury Marion Safford San pedro Littleton Lexington Fort dix Beaumont Bennettsville Petersburg Allenwood Talladega Edgefield Big spring Pekin Glenville Leavenworth Butner Fort worth Loretto

J & L America Incorporated

Southfield Livonia

Miscellaneous Foreign Contractors

Frankfurt am main Isando Washington Arlington

National Industries For The Blind

Wayne Earth city Alexandria

Sign up to access Documents

Signup now

Amendment A0002 - This Amendment serves to answer submitted questions. The answered questions are posted to
the solicitation on SAM.gov.

The response date and time remains unchanged.

-----------------------------------------------------------------------------------------------------------------------

This Project is located at the Spearfish Work Center within Black Hills National Forest. The
scope of work for this project includes removal of existing asphalt roofing system to the deck,
inspection of the deck and replacement of deck material as needed, and installing a new asphalt
roofing system on the Work Center Shop. Work also includes removal and replacement of Shop
gutters and downspouts.

The Contractor shall be responsible for field verifying all dimensions and quantities of materials
required on this project.

ALL construction activities shall be performed in accordance with all applicable OSHA
standards or regulations. Some of the safety hazards that may be encountered while working on
this site will be use of ladders, lifts, hoists, various hand tools, working on sloped surfaces, use of
fall protection equipment, and use of applicable PPE.

The Contractor will be required to cooperate with Government during construction operations to
minimize conflicts and facilitate Government usage. Work shall be performed so as not to
interfere with Government's day-to-day operations. Work shall be scheduled to minimize
impacts to Government. All constructions operations shall be confined to immediate area of
work. Contractor shall sweep and clean work areas and accessways daily to remove nails,
screws, staples and other construction debris and minimize hazards to government employees,
vehicles, and the public. Contractor shall not disturb portions of site that are not included in the
described Work.

Contractor shall provide schedules in electronic format and include a written summary narrative
to explain basis of approach to work. Schedule contract work and monitor progress using a
Critical Path Method (CPM) or similar type scheduling system. Prepare construction Schedule
to complete the Work within the contract time requirement.

Similar Opportunities

Spearfish South dakota 21 May 2024 at 6 PM
Spearfish South dakota 21 May 2024 at 6 PM
Spearfish South dakota 21 May 2024 at 6 PM
Homestead Florida 15 Jul 2024 at 4 AM (estimated)
Location Unknown 13 Jul 2024 at 4 AM (estimated)

Similar Awards

Location Unknown 10 Aug 2010 at 3 PM
Forest Virginia 08 Jun 2015 at 12 PM
Quincy California 15 Jul 2015 at 5 PM
Madison Wisconsin Not Specified
Cutler Maine 09 Aug 2017 at 7 PM