Sign up to access Documents
Signup now
The project work consists of maintenance dredging Tampa Harbor at identified dredging areas indicated on the drawings. Dredge areas will incorporate 1 foot of allowable overdepth. All dredged material is to be disposed of in DMPF-2D. Additional work includes turbidity monitoring, sea turtle trawling and relocation, bird monitoring, and environmental species monitoring. Note: Coast Guard Certified dredge equipment is required to complete the work.