State Contract Opportunity

Last Updated on 05 Jun 2025 at 4 AM
bid
Perris California

TVRWRF Sidestream Treatment Facility

Details

Solicitation ID Spec # 1548S
Posted Date 05 Jun 2025 at 4 AM
Response Date 17 Jul 2025 at 2 PM
NAICS Category
Product Service Code
Set Aside No Set-Aside Used
Contracting Office Not Specified
Agency Eastern Municipal Water District
Location Perris California United states

Possible Bidders

Sign up to access Documents

Signup now
SC-02 - Scope of Work . Under these Specifications, the Contractor shall perform the construction of a sidestream treatment facility at the Temecula Valley Regional Water Reclamation Facility (TVRWRF) in accordance with these specifications and the contract drawings. The scope of work for this project primarily includes, but is not limited to, the following: 1. One centrate transfer pump station. 2. One sidestream treatment facility consisting of equalization and reactor tanks and associated equipment. 3. One sidestream service building, including new blowers, chemical dosing facilities, interconnecting piping, electrical equipment and ductbanks, and civil improvements including paving and grading. 4. Modification of the existing drain lines at the existing sludge dewatering building, modifications to dewatering equipment to convey wastewater separately from belt press filtrate, and construction of a antiscalant chemical system. 5. Associated electrical, instrumentation and control system improvements and modifications. 6. Control integration services by a qualified integrator. 7. Demolition, repair and reconstruction of existing improvements affected by the work, and completion of all work necessary to render the facility complete and operational. It is the intent of the contract documents to describe the functionally complete sidestream treatment facility to be constructed. Any work, material or equipment that may be reasonably inferred from the contract documents and being required to produce the intended result shall be supplied whether or not specified or shown on the contract documents. It is the responsibility of the bidding Contractor to request all clarifications and interpretations of the prior to opening of the bid.