Federal Contract Opportunity

Last Updated on 01 Jul 2025 at 8 PM
Combined Synopsis/Solicitation
Bellingham Washington

USCG Station Bellingham Generator Upgrade

Details

Solicitation ID SPS-USCG-250005
Posted Date 01 Jul 2025 at 8 PM
Response Date 08 Jul 2025 at 9 PM
NAICS Category
Product Service Code
Set Aside Total Small Business (SBA) Set-Aside (FAR 19.5)
Contracting Office Base Seattle(00033)
Agency Department Of Homeland Security
Location Bellingham Washington United states 98225

Possible Bidders

Miscellaneous Foreign Contractors

Frankfurt am main Isando Washington Arlington

Miscellaneous Foreign Awardees

Ciudad de mexico Toronto, ontario Bertrange Arlington Madrid Washington St lo Kampala

Miscellaneous Foreign Awardees

Ciudad de mexico Toronto, ontario Bertrange Arlington Madrid Washington St lo Kampala

Supplycore Incorporated

Rockford Santa fe springs North kansas city Atlanta

Ww Grainger Incorporated

Cleveland Anchorage Lake forest Boston Atlanta Chula vista Saint louis Niles

Sign up to access Documents

Signup now

Update #1: Pictures posted of the current generator and wiring for viewing and comparison. 

Description of Services: Installation of updated Gas Generator, removal and disposal of current generator. Expanded details listed below. 

Contractor shall provide labor, material, and supervision to perform a replacement of a site stand-by generator as described herein. Contractor shall perform all construction work and remove all associated waste IAW local, state, and federal regulations.
a) Furnish and install three phase, 80kw, 120/208V, 300 Amp GENERAC or approved equal natural gas generator compatible with the installed breaker panels.
b) Furnish/modify and install pad and anchors for new generator.
c) Replace all natural hoses between the main gas line supply/return valves and the generator with rigid piping except where flexible hose may be required on the generator gas system supply & return connections.
d) Furnish and install all necessary cabling between generator, load bank, and transfer switch.
e) Ensure proper operation of the transfer switch and installed load bank, run test for 3 hours.
f) Remove existing Generator and properly dispose.

Refer to site plans. 28 Bellwether Way, Bellingham, WA 98225. Latitude and Longitude from google maps 48.75502N 122.49459W. Site visits encouraged. 

The contractor must perform to the standards in this contract. All work shall comply with all applicable codes, along with Federal, State and local regulations. This notice is a combined synopsis/solicitation for a commercial products and commercial services in accordance with Federal Acquisition Regulation Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes a public solicitation. Please read this entire notice, the instructions herein, and the attachment documents carefully. This acquisition is on a Small Business Set-Aside only.


HOW TO RESPOND: To compete for this project, interested parties must be registered in SAM (System for Award Management) prior to close of this solicitation. https://www.sam.gov/portal/public/SAM/. The vendors SAM registration must be in an “ACTIVE” status prior to award. Vendors must ensure that the above listed NAICS codes are listed on their SAM registration to perform this type of service.

COST PROPOSALS: The contract will be awarded using simplified acquisition procedures in accordance with FAR part 13 and part 15 provide Firm Fixed-Price “broken out by labor hours, labor category, materials, and other direct costs”. Offerors must submit the proposal to Elizabeth Meister e-mail: [email protected].


EVALUATION CRITERIA: The government will award a contract resulting from this request for quote (RFQ) to the responsible offeror whose offer conforming to the RFQ is the Lowest price Technically Acceptable (LPTA) quote. The lowest priced quote will be evaluated on technical acceptability, if it is found to be acceptable, an award will be made. If it is found to be unacceptable, the next lowest price will be evaluated. This process will continue until a technically acceptable offer is identified.

GENERAL REQUIREMENTS:
The Contractor shall comply with all applicable federal, state, and local laws, regulations, and codes, including but not limited to:
-Occupational Safety and Health Administration (OSHA) regulations
-National Electrical Code (NEC)
-Environmental Protection Agency (EPA) regulations

TECHNICAL REQUIREMENTS:
 Furnish and install three phase, 80kw, 120/208V, 300 Amp GENERAC or approved equal natural gas generator compatible with the installed breaker panels.

Ancillary Equipment
The Contractor shall furnish and install the following ancillary equipment:
All fuel hoses inside the generator hut, including those between the main tank supply/return valves, the day tank, and the generator, shall be replaced with rigid piping. Flexible hose may be used only for the generator fuel system supply & return connections.
All necessary cabling between the new generator, load bank, and transfer switch shall be furnished and installed, ensuring proper connections and code compliance.

ADDITIONAL REQUIREMENTS FOR AWARD ARE OUTLINED IN THE ATTACHED SCOPE OF WORK. PLEASE REVIEW SCOPE OF WORK FOR COMPLETE OUTLINE OF JOB REQUIREMENTS. SITE VISIT ENCOURAGED AND WELCOME.
Submit quotes to the following e-mail address by the offer due date and time: Attn: Elizabeth Meister
E-Mail Address: [email protected] with solicitation RFQ number SPS-USCG-250005 in subject line. Thank you!

Similar Opportunities

Bellingham Washington 08 Jul 2025 at 9 PM
Location Unknown 07 Jul 2025 at 4 AM
Tinker air force base Oklahoma 26 Jul 2025 at 4 AM
Location Unknown 11 Jul 2025 at 4 AM
Tinker air force base Oklahoma 07 Jul 2025 at 9 PM