This project w ill dredge the Big Suamico Harbor. Both base work and all option work is to be completed in one dredge season. The base work includes dredging up to 20,000 cubic yards of material. Option work w ill include dredging up to an additional 20,000cubic yards. The dredge depth in the Big Suamico Harbor is minus 8 Lower Water Datum (LWD). The dredge area w ill have an allow able 2- foot over-dredge tolerance.