PROJECT DESCRIPTON:
Contractor shall furnish labor and materials and perform work to modify existing TRs, Office of Information Technology (OIT) infrastructure, and fiber optic cabling, as required by drawings and specifications. The scope of this project included the following infrastructure improvements: Electrical (electrical panel upgrade, power- normal and emergency), Bonding, Uninterruptible Power Supply (UPS), Building Management System (BAS) interfaces, assess for new and upgrades to existing HVAC, reconfiguration, expansion, and renovation of existing space (demo, new construction, finishes). Expand space in MFA (demo, finishes, cable management, relocate cabinets), communication infrastructure (new data outlets, patch panels, upgrade to Cat 6A cable) in buildings as necessary, physical security upgrades, assess and upgrade fiber infrastructure backbone campus wide within buildings and between buildings, install diversified path to data center for Wide Area Network (WAN), hazardous material abatement.
Project locations include buildings 1, 5, 6, 7, 8, 9, 12, 20, 35, 36, 37, 39/44, 45 and site.