State Bid

Last Updated on 08 Apr 2024 at 12 AM
Mississippi

Zone 3N Pavement Maintenance & Aspen Dr. Sewer Replacement PJ No. 2623 & 2703

Solicitation ID Not Specified
Posted Date Not Specified
Archive Date Not Specified
NAICS Category
Product Service Code
Set Aside No Set-Aside Used
Contracting Office Not Specified
Agency City Of Concord Engineering Services
Location Mississippi United states
Point Of Contact Not Available
Bid Schedule A – Zone 3N Paving Project in general consists of mobilization; traffic control; water pollution control program; cold planning and wedge grinding of asphalt roadway section; installation of Hot Mix Asphalt (HMA) levelling courses and overlays; removal & replacement HMA including dig-out repairs; adjustment of utility covers and monument covers to finish grade; removal & replacement of speed humps, traffic striping and pavement markings; and installation of new signs; and all other work shown on the Plans and as specified in these Special Provisions. Bid Schedule B – Aspen Dr Sewer Project in general consists of pipe bursting the existing 10” VCP sanitary sewer main and installing a new 12” SDR 17 HDPE PIPE including restoring the connections to existing manholes and reconnecting existing laterals to the new main, utility locating and protection, installation of bedding, backfill and paving as needed and performing related traffic control, public convenience and temporary bypass systems as shown on the Plans and as specified in these Special Provisions. Bid Schedule C – Robin Ln & Meadow Ln Storm Drain in general consists of removal of existing 22”x36” Oval DIP and replacement with new 24” RCP, CL V including restoring the connections to existing manholes, utility locating, installation of bedding, backfill and paving as shown and performing related traffic control, public convenience and temporary bypass systems as shown on the Plans and as specified in these Special Provisions. The estimated total construction cost is $700,000.
Bid Protests Not Available