Federal Bid

Last Updated on 22 Apr 2013 at 8 AM
Solicitation
Redstone arsenal Alabama

14--Guided Multiple Launch Rocket System (GMLRS) Full Rate Production (FRP) for Guidance Section and Control Section Assembly Qualification Test Assets

Solicitation ID W31P4Q-12-C-0151
Posted Date 21 Feb 2013 at 10 PM
Archive Date 22 Apr 2013 at 5 AM
NAICS Category
Product Service Code
Set Aside No Set-Aside Used
Contracting Office Not Specified
Agency Department Of Defense
Location Redstone arsenal Alabama United states 35898
****ATTENTION****FORMAL COMMUNICATION RELATED TO THIS ACQUISITION SHOULD BE DIRECTED to Erica L. McClain. You may FAX or mail your request ATTN: CCAM-TM-B, Erica L. McClain, Contract Specialist, FAX number 256-955-8478. NO TELEPHONE REQUEST WILL BE ACCEPTED. PRON: PF3GMPS22K and PF3GMPS32K, NOUN: GMLRS Unitary production FRP 7, Quantity: 12 Guidance Section and 12 Control Section Assembly test sets. FOB origin delivery. The required deliveries completed within 12 months (FY 13 - FY 14) after contract modification. This item is restricted to Lockheed Martin Corporation, Missiles and Fire Control -Dallas (LMMFC-D), P.O. Box 650003 Dallas, TX 75265, Cage Code 64059, because this is the only contractor with the knowledge, experience, capability, technical expertise, and facilities to produce GMLRS rockets. Lockheed Martin will integrate this hardware into the existing GMLRS rocket. The Guidance Section and Control Section currently have obsolescence related redesign qualifications as part of the current GMLRS Unitary production contract to be incorporated into FRP-7 production through obsolescence efforts. The data needed to acquire this part competitively is not physically available, it cannot be obtained economically, nor is it possible to draft adequate specifications or any other adequate, economical description of the material for a competitive solicitation. Firms that recognize and can produce the required item described above will receive due consideration as prescribed by law. The closing date annotated is an estimated date and may be adjusted dependent upon the date of release for solicitation; however, the solicitation will not close prior to the date stated above. Foreign firms are reminded that all requests for solicitation must be processed through their respective embassies.
Bid Protests Not Available

Similar Opportunities

Hill air force base Utah 12 Jul 2025 at 6 PM
Edwards California 18 Mar 2027 at 7 AM
Edwards California 18 Mar 2027 at 7 AM
Edwards California 18 Mar 2027 at 7 AM
Edwards California 18 Mar 2027 at 7 AM