Construction of approximately 3600 SY of 2” grind and overlay, 150 LF of curb and gutter removal and replacement, vehicular detection loop replacement, temp and permanent striping, traffic control, and other work necessary to complete the Project. Join Live Event bid opening July 30, 2020, 2:00 p.m. Click on the link to join the bid opening. Download the "Bid Opening via Live Event Instructions" PDF for instructions on joining the event.
Bid Protests Not Available