Scope of Work: This project will be funded with 2023 LMIG and SPLOST funds. Construction includes asphalt overlay/repaving on Cove Road, Worley Crossing Road, Reavis Road, Ray Mountain Road, and Corinth Church Road in Pickens County. The work will include approximately 161,897 SY of Resurfacing using 14,820 tons of asphalt paving. Paint striping and manhole/valve box adjustments as necessary are specified for all pavement overlay areas. All work shall conform to the Georgia Department of Transportation’s (GDOT) Standard Specifications Construction of Transportation Systems, 2021 Edition; GDOT’s Supplemental Specifications Construction of Transportation Systems, 2021; and all applicable GDOT Standards and Details; and other contract requirements, specifications and general conditions. Bid Documents may be obtained at the County Office Location by appointment. Proposers are encouraged to request Bid Documents via email. All proposers requesting plans and bid documents will be emailed bid documents and/or granted access to the Engineer’s FTP site containing digital copies of plans, specifications, and addenda. No documents will be mailed. Request for Bid Documents and any questions regarding the project or to schedule an appointment to pick-up plans at the County’s office should be emailed simultaneously to
[email protected],
[email protected], and
[email protected] (Questions must be received no later than 5:00 p.m. on Friday, April 14th, 2023). Responses will be posted to the FTP site as an Addendum. Additional addendums may be issued during the proposal period. All proposers are responsible to check the Engineer’s FTP site for addendums.
Bid Protests Not Available