The project consists of Full Depth Reclamation (FDR), asphalt overlay with 2 inches of 12.5 mm Superpave, installation or replacement of thermoplastic striping as directed, traffic control, erosion control, and dust control of River Lake Drive from the intersection of River Lake Drive and Cedar Grove Road to the cul-de-sac, a portion of Watkins Road from the intersection of Watkins Road and Hutchesons Ferry Road to the City Limits, a portion of Sardis Road from the intersection of Sardis Road and Hutchesons Ferry Road to the City Limits, and all streets within the Crossroads Subdivision
Bid Protests Not Available