Reference attached North End Zone Scoreboard Pricing Set (10/1/2020) Proposed screen is same aspect ratio as the current screen on South End Zone (SEZ), constructed and installed on the top of the Upper Deck Stands at the North End Zone. Camera platform to be on top of scoreboard with catwalks and access pathways behind the board. Letters to be mounted on the top of the board to help conceal the cameras. Existing structure to be used, and seating areas taken up by and impacted by board to be removed/changed accordingly. All electrical, IT, AV cabling to make board fully operational with systems at the stadium to be a part of the project. Any additional structural strengthening to be included in project. All sheathing of the new LED Scoreboard to be included in bid.
Bid Protests Not Available