STATEMENT OF REQUIREMENT Replacement steam coil for Surgery AHU Parts only Requirement: This is an equipment purchase. We are replacing the surgery AHU steam coil, (AHU-26-04-01). This coil must be like kind to fit int the same sot as the old one to prevent any type of modifications. The KCVA HVAC staff will install this unit. Background: The surgery AHU steam coil is located on BLDG 25, 4th floor. The main purpose of this coil is to provide heating to all ORs on the 5th floor, Excluding OR 7 and 8. The old steam coil has multiple leaks in it due to a power failure during freezing temperatures. Salient Characteristics: Engineered Air Coil 54 x 99 x 2r/6 FPI c/w MPT connections. Outside of frame of coil is 57 X 102 X 20 The coil needs to be a wing IFB horizontal tube integral face and bypass coils. The IFB coil controls air temperature while maintaining full steam pressure in the coil. The preset discharge air temperature is constant, regardless of variations in the inlet air temperature. Extended surface type, counter-flow operation, constructed of 5/8 O.D. 0.035 seamless copper tube and 0.010 continuous aluminum fin. 25 PSI Steam 3 MPT Supply Connections on left of coil, 2 MPT Condensate Connections right side of coil. KVAC Point of Contact: Zachary Homan, M&O Supervisor,
[email protected] Warranty Requested: Standard one-year warranty minimally, or manufacturer s standard warrant.
Bid Protests Not Available