The existing 3” conduit that two 288-strands fiber cables are in needs to re-routed for the SDOT Yesler Way Over 4th Ave S Bridge Project, PW#2015-026. A 4’x4’x4’ manhole needs to be installed over the existing SDOT/Street Lighting conduit duct bank without disturbing the live fiber cables in the sidewalk on the east side of 4th Avenue, just north of the Yesler Street Bridge Overpass. A 3” conduit, schedule 80, needs to be install from the new manhole, south approximately 140 feet, to an existing manhole in the sidewalk, just south of the Yesler Street Bridge Overpass. The conduit needs to be installed on the west side of the cement panels in the parking lane, approximately 10 to 12 feet from the curb. Multiple construction projects in this area. This project must start and complete prior to the Yesler Way over 4th Ave S Bridge project which is under separate contract, PW#2015-026.