The Contractor shall furnish all design effort, labor, supplies, equipment, supervision, all devices, components, and all other materials necessary for the installation of a NEW fully functional Galaxy Access Control System, Bosch IP addressable CCTV system and motion sensors in the aircraft hangars, and exact locations will be provided by the Contracting Officers Representative (COR) at pre-proposal site-visit. The Contractor shall provide shop drawings, to include drawings of the building(s), identifying all components, modules, peripheral devices EMT conduit runs, and wiring details. All equipment shall have the manufacturers name and logotype label. Solicitation Document(s) are available at http://www.ripfo.ngb.army.mil/EBS/ADVERTISEDSOLICITATIONS.ASP.
Bid Protests Not Available