Contractor to provide all parts, labor, tools, materials, facilities and transportation necessary for:Request to replace the existing non-functioning refrigeration unit with a new system, ensuring proper operation and compatibility with the existing setup.
The vendor will be required to provide all necessary labor and materials to complete the follow:
Objective: To replace the existing non-functioning Heatcraft PTN128H2C refrigeration unit with a new split system, ensuring proper operation and compatibility with the existing setup .
1. Initial Site Visit and Assessment:
- Conduct a thorough site assessment to evaluate the current setup and identify any potential challenges.
- Confirm the box dimensions to ensure compatibility with the new split system.
2. Equipment Procurement:
- Procure a new split system refrigeration unit to replace the discontinued Heatcraft PTN128H2C unit.
- Ensure that the new system meets all necessary specifications and requirements for the site.
- Ensure that the new system will meet necessary requirements for needed temperature levels for walk in fridge.
3. Preparation:
- Disconnect and safely remove the existing Heatcraft PTN128H2C refrigeration unit.
- Prepare the site for the installation of the new split system, including any necessary modifications to the existing infrastructure .
4. Installation:
- Install the new split system refrigeration unit, ensuring all components are properly connected and secured.
- Connect the new system to existing duct connections, drain lines, refrigerant lines, and electrical connections as needed.
5. System Testing:
- Pressure test the new system and charge it according to the manufacturer's specifications.
- Start, test, and ensure proper operation of the new split system.
6. Final Verification:
- Confirm that the new system is functioning correctly and efficiently.
- Verify that all connections and components are secure and meet safety standards.
7. Documentation:
- Provide detailed documentation of the installation process, including any modifications made to the existing setup.
- Include a final report confirming the successful replacement and operation of the new split system[JS8] [RP9] .