Point Of Contact Not Available
The Special Provisions cover in general, the construction of drainage facilities from 25th Street through the South Sacramento Islamic Center to 65th Avenue. The work to be performed consists of constructing drainage pipeline, manholes, drains, and associated work. The Contractor shall provide all labor, materials, tools and equipment, and shall perform all work necessary to complete the subject project in place and make all required connections to the existing drainage system as shown on the Plans and as specified. For more bidding and project information contact: Mark Elliott, Associate Engineer (916) 808-8894
Bid Protests Not Available