Federal Bid

Last Updated on 05 Jun 2006 at 4 AM
Solicitation
Location Unknown

66--INTERCONNECT MODULE - Previously synopsized as FA810305Q0536

Solicitation ID FA8103-06-Q-0364
Posted Date 07 Mar 2006 at 5 AM
Archive Date 05 Jun 2006 at 5 AM
NAICS Category
Product Service Code
Set Aside No Set-Aside Used
Contracting Office Pk/Pz Tinker Afb
Agency Department Of Defense
Location United states
PR Number(s): Item: 0001 NSN: 6610012476374 INTERCONNECT MODULE P/N: ED749243-10, P/N: 749243-10, Description: Total Line Item Qty: 0.0000 PR Number(s): FD20300635313 Item: 0001AA NSN: 6610012476374 INTERCONNECTING BOX P/N: ED749243-10, P/N: 749243-10, Description: Total Line Item Qty: 2.0000 Applicable to: F-15 EAGLE Destn: FB2039,Tinker AFB,OK.,73145-9013. Delivery: , 2.00 PR Number(s): Item: 0001AB NSN: 6610012476374 INTERCONNECTING BOX P/N: ED749243-10, P/N: 749243-10, Description: Total Line Item Qty: 2.0000 Applicable to: F-15 EAGLE Destn: FB2039,Tinker AFB,OK.,73145-9013. Delivery: , 2.00 The anticipated award date will be:08MAY2006 Electronic procedure will be used for this solicitation.
Bid Protests Not Available

Similar Past Bids

Similar Opportunities

Colorado 25 Jul 2025 at 4 AM (estimated)
Colorado 25 Jul 2025 at 4 AM (estimated)
Medical Science Building - 7E Renovation (CP2400920) On January 26th 2024 a fire and explosion occurred on the 7th floor of MSB in the east wing laboratories. Physical damage was extensive within the high impact area of approximately 5000 SF impacting interior construction including mechanical electrical and plumbing infrastructure, exterior windows, casework and finishes. ed and destroyed lab casework, and damaged interior finishes. More limited damage extended to other areas of the east wing. Existing windows, mechanical, electrical, plumbing, fire suppression, and fire alarm systems were damaged and will need to be replaced in the high impact area and partially replaced or repaired where the impacts of the incident extended to other areas of the 7thy floor. The repair project will return the 7th floor east wing to service for research. The project scope includes renovating approximately 11,800 square feet of high and low impact areas of the 7th floor. The project includes an alternate restroom renovation designed to meet current codes. Infrastructure repair and replacement includes wet pipe fire suppression, acid waste & vent stack replacement, sanitary waste & vent stack replacement, domestic water and lab water systems, lab gas replacement, plumbing equipment replacement, telecom infrastructure, and window replacement. Laboratory repairs include fume hood and laboratory replacement, and required laboratory sinks, eye wash, and infrastructure needed to support specialized laboratory equipment. The project will develop two separate sets of bid documents for competitive bidding, one of which will capture the preexisting laboratory build out and one that modifies the previous existing laboratory design to more closely align with ongoing lab renovations in other areas of the building and the long range masterplan for the Medical Science Building. Base Estimate & Alternates: $4,180,000.00
Location Unknown 29 Jul 2025 at 4 AM