The VA Boston Healthcare System (VABHS), West Roxbury Campus, intends to negotiate on a sole source basis pursuant to FAR 6.302-1 -- Only One Responsible Source and No Other Supplies or Services Will Satisfy Agency Requirements with ADTECH Systems of Sudbury, MA, a small woman owned business for the purchase of two CTS-INTP-C40-K9 units along with related equipment and installation. This is because ADTECH is the only known company that can meet the unique compatibility requirements as they are the primary vendor for the required equipment.
This requirement will include the following characteristics:
Product Description
Cisco - CTS-INTP-C40-K9 IntPkg C40-NPP Rmt Cntrl1 Mic Cbls ++ two each;
Cisco - CON-PZDN-INTPPC40 ZCare 24X7XNBD Technical Support for IntPkg C40-NPP Rmt Cntrl 1 Mic Cbls +++ two each
Cisco - LIC - INTP-C40-MS IntPkg Codec C40 4Way Individual Transcoding Multisite two each
Cisco - LIC-INTP-C40-PR IntPkg Codec C40 Premium Resolution (1080p/720p60) Option two each
Cisco - CTS-PHD-1080P4XS PrecisionHD 1080p Camera w 4x zoom-not stand alone two each
Cisco - CON-PZDN-1080P4XS ZCare Premier MSTR 24X7XNBD for PrecisionHD 1080p Camera w 4x zoom-not stand alone two each
Cisco - CAB-VCDC-20M= PrecisionHD Camera Daisy-Chain cable for Visca Control-20M two each
Cisco - PSU-CAM-V= Power Supply for PHD Camera two each
Cisco - PWR-CORD-US-A= Pwr Cord US 1.8m Black YP-12 To VC-12 two each
Cisco - CAB-VS-20M= Visca Control Cable 20m-DB9 to RJ45 two each
Extron - 60-864-13 HDMI 201 A D Tx two each
Extron - 60-806-13 HDMI 201 Rx two each
Hardware - Cables/Connectors/Hardware two each
Labor - Design & Engineering 2 each; Control Programming 2 each; Field Installation 2 each; Project Management 2 each; Project Administration 2 each and One (1) Year Service Plan 2 each
This Notice of Intent is NOT a request for competitive proposals. Small businesses may identify their interest, accompanied by supporting literature, to the Contracting Officer no later than 06/18/2014 @ 2:00pm. Responses should be sent to
[email protected]. Information received will be for the purpose of determining whether or not to conduct a competitive procurement. The determination to conduct a competitive procurement based on responses to this notice is solely within the discretion of the Contracting Officer.
Bid Protests Not Available