Point Of Contact Not Available
The proposed Work includes full depth removal and reconstruction of PCC taxiway pavement along Taxilane C from Runway 6-24 through Taxiway C7. Construction of new C8 and reconstruction of C7 are also included. Replacement of asphalt shoulder, electrical infrastructure, and storm drainage infrastructure is also included. Installation of new artificial turf islands is also included.
Bid Protests Not Available