FINAL CLOSURE OF SUBTITLE âDâ â AREA I-B AT THE VERMILION PARISH SOLID WASTE FACILITY FOR THE VERMILION PARISH POLICE JURY The Work Shall Consist of the Following: (1) Grade/Level Entire Area I-B Using GPS Equipment for Approximately 10.9-Acres. (2) Furnish All Equipment to Excavate Clay Soil From Vermilion Parish Borrow Pit on Bella Road and Transport to Area I-B. (3) Grade, Level, Compact Entire Area I-B with 2-Feet of Clay Soil to Grade Using GPS Equipment. (4) Furnish All Equipment to Excavate Top Soil from Vermilion Parish Borrow Pit on Bella Road and Transport to Area I-B. (5) Grade, Level, Compact Entire Area I-B with 6-Inches of Top Soil to Grade Using GPS Equipment. (6) Furnish/Install 6,400-Square Yards of 60-Mil HDPE Liner Between the 2-Foot Clay Soil and 6-Inch Top Soil. (7) Furnish/Install All Material/Equipment Necessary for Applying 12-Inch Soil Cement Base and 2-Inch Asphalt Overlay on Entrance Roadway a Distance of 600-Feet and Patching and 2-Inch Asphalt Overlay on Side Road a Distance of 1,500-Feet Together with a 50-Foot Radius Turn Around, and All Other Associated Work for Area I-B Subtitle âDâ Cell and Associated Work for Road Improvements.
Bid Protests Not Available