Project generally consists of, but is not limited to the following: 1. Funish competent surveying resources to properly layout the subject site and provide horizontal and vertical control. 2. Perform site preparation work for construction of the S-BUEC, including: Install reinforced concrete foundations for the antenna poles - Install the GFM antenna poles - Install an earth electrode system (EES) for the equipment shelter and the antenna pole - Direct-earth burial of coaxial cables from the antenna pole to the equipment shelter - Install enclosures conduit, wiring etc. - Install cable tray 3. Restore all sites to previous condition, where disturbed by construction activities 4. Install and maintain erosion control measures to protect ditches and inlets 5. Accomplish other incidental duties to accommodate site specific conditons. Price Range will be $25,000.00 to $50,000.00. Interested parties please respond by e-mail to above address or fax your request to 816-329-3! 137. Correct solicitation number to refer to is DTFACE-03-R-23009
Bid Protests Not Available