Scheduled Maintenance Service for Security Turnstiles
Service & Month Interval
1. Turnstile Foundation Cleaning: 1MO
2. Solenoid Assembly Inspection: 3MO
3. Self-Centering Plunger Lubrication: 3MO
4. Indicator Light Inspection: 3MO
5. Panel Cleaning: 3MO
6. Ratchet Assembly Inspection: 6MO
7. Plunger Roller Inspection: 6MO
8. Pivot Arm Lubrication: 12MO
9. Pivot Arm Inspection: 12MO
10. Locking Assembly Lubrication: 12 MO
11. Locking Bar Assembly Inspection: 12MO
12. Self-Centering Spring Adjustment: 12MO
13. Self-Centering Shock Absorber Adjustment: 12MO
14. Self-Centering Speed Control Spring Inspection: 12MO
15. Limit/Rotation Switch Inspection and Adjustment: 12MO
16. Controller Adjustment: 12MO
17. Electrical Wiring Inspection: 12MO
18. Fastener Inspection: 12MO
19. Turnstile Stability Inspection: 12MO
20. Spindle Arm Inspection: 12MO
21. Panel Inspection: 12MO
22. Bottom Spindle Bearing Lubrication: 12MO
23. Pivot Arm Spring Replacement: 12MO
Notes:
1. A complete inspection should be performed on the turnstile after one full month of service.
2. If necessary lubrication of the bushings is to be done with a silicone or Teflon based spray lubricant.
3. A general purpose lithium based grease is to be used to lubricate the lower spindle bearing.
Recommended Spare Parts
21-113 Limit/Rotation Switch 85-225 Solenoid
51-215 PLC Control Unit 85-270 Upper Flange Bearing
53-523 Bridge Rectifier 85-285 Self-Centering Mechanism Spring
53-791 Transformer
85-143 Lower Flange Bearing
85-156 Speed Control Cylinder
85-213 Solenoid Plunger Return Spring
85-214 Pivot Arm Spring
85-215 Linkage Pin To Pivot Arm