Work will involve furnishing all labor, materials, equipment, services, quality assurance and construction including but not limited to grinding, cold milling, hauling and disposal of the existing asphalt and concrete and installment of new pavement, excavation for pavement base repair for approximately 12.1 miles of streets of which 7.7 miles are in the Base Bid and 4.4 miles are in Additive Alternate B, speed hump removal and replacement, raising appurtenances and survey monuments to grade, sweeping, installation of curb ramps to meet ADA requirements, sidewalk panel removal and replacement, curb and gutter removal and replacement, cross gutter and alley apron removal and replacement, commercial driveway replacement, relocation of pedestrian push buttons, installation of pedestrian barricades, tree trimming, root pruning, installment of root barriers, tree removal, replacing traffic striping/ markings/ markers/devices, replacing vehicle detector loops and stubs, traffic control drawings and permits, storm drain inlet protection, and installation of inlet markers for various streets throughout the City. The project is located in council districts three (3), eight (8) and nine (9).
Bid Protests Not Available