Addendum #1 This addendum shall be added to and become part of the original Invitation to Bid. 1. Photographs of the boiler room are posted on ORPIN. 2. Section 230549 Concrete Pads is posted on ORPIN as a download item. QUESTIONS & ANSWERS Question: What is the control system for existing boiler? Answer: Control system for existing system is stand alone. ODOC is wanting a stand alone for the new specified system. Question: Boiler room door dimension? Answer: 34.5" Question: Existing boiler is larger than 34.5". How is the boiler to be removed? Answer: Existing boiler will be disassembled to be removed. Question: Does ODOC want to keep the existing boiler? Answer: The existing scrap metal from boiler will be piled in a designated place located in the outside yard. Question: Any problems with boiler floor drain? Answer: No Question: Is chimney lined? Answer: Yes Question: Floor to ceiling dimensions where boiler exhaust connects with brick chimney. Answer: 8'6" Question: Dimensions from exterior wall to sheet metal fresh air duct. Answer: 12'3" Question: Natural Gas pressure. Answer: Low Pressure. Question: Where can contractor store parts and tools? Answer: Tools can be secured and locked in job box stored in boiler room. Parts can be stored in boiler room. Question: Can welding be done in boiler room? Answer: As long as the welding is being done OSHA compliant. Opportunity Summary "The Oregon Department of Corrections is seeking bids for the MCCF BOILER REPLACEMENT. The Invitation to Bid document, specifications and drawings are available from ORPIN as download documents - Bidders are encouraged to bring all documents to the pre-bid meeting as they will not be provided. A MANDATORY pre-bid TEAMS (formerly SKYPE) meeting will be conducted online at on 10/20/2020 at 9:00 AM (PST) sharp. Bidders requesting participation in the TEAMS meeting are required to notify the Single Point of Contact no later than 4:00 PM on 10/19/2020. A physical site job-walk will be conducted at MCCF, 5465 Turner Rd. SE Salem, OR 97317. Bidders are required to submit the LEDS by the stated deadline. No blue denim, camouflage, tight fitting or low midriff clothing is permitted. Late arrivals will not be allowed to attend. All bidders must attend the mandatory pre-bid meeting and site visit in its entirety. General Contractors are highly encouraged to bring Sub-Contractors and Suppliers as a second site visit MAY NOT be available. The single point of contact is Craig L. Heilman (
[email protected]) at (503) 983-0969; alternate point of contact:
[email protected] 971-707-0238. For call centers: For further assistance please call the ORPIN Help Desk at (503) 373-1774 or send email to:
[email protected]" ORPIN link: "http://orpin.oregon.gov/open.dll/welcome" OPPORTUNITY: #291-2003-20"
Bid Protests Not Available