Point Of Contact Not Available
ADVERTISEMENT FOR PRE-QUALIFICATION AND NOTIFICATION OF BID FOR ADLAI E. STEVENSON HIGH SCHOOL DISTRICT #125 EAST BUILDING ADDITION PHASE II - FITNESS ADDITION LINCOLNSHIRE, IL BID RELEASE 6 Gilbane Building Company, Construction Manager, for and acting on behalf of Stevenson High School District #125 Board of Education, is receiving lump sum proposals from interested contractors for the Adlai E. Stevenson High School - East Building Addition Phase II Project Fitness Addition in Lincolnshire, IL. The East Building Addition Phase II Fitness Addition consists of an 89,000 gsf health and wellness addition and is being bid in four separated phases (Bid Releases 3-6). Bid Release 6 includes the following bid packages. BID RELEASE 6 - BID PACKAGE BP# Description 09C Drywall/Acoustical Ceiling Work 09D Resilient Athletic Flooring Work 09E Carpeting/Resilient Flooring Work 09F Resinous Flooring Work 09G Terrazzo Work 09H Ceramic Tile Work 09I Painting Work 11C Food Services Work 32D Synthetic Turf Work The bid documents will be distributed to pre-qualified bidders on or about Tuesday, December 15, 2020. A Pre-Bid Conference will be held on Tuesday, December 22, 2020 at 2:00 p.m. local time via online Teams meeting. Individual site visits may be scheduled separately with the Construction Manager - contact Jeremy Roling at 773-499-8218 to schedule a site visit. NOTE: Face covering and proper PPE is required to visit the site. No-one will be allowed onsite without a face covering or PPE. The proposals will be due on Friday, January 22, 2021 at 2:00 p.m. local time via bidder's prequalification account at www.ibidpro.com. To bid this project, bidders must be qualified by Gilbane Building Company. The prequalification application is to be completed online at www.ibidpro.com. Bid Security in the form of a bid bond in an amount equal to ten percent (10%) of the base bid is required from all Bidders. No other forms of Bid Security will be accepted. Guarantee Bonds in the form of a Performance Bond and Labor and Material Payment Bond in an amount equal to one hundred percent (100%) of the bid will be required from the awarded Bidder. The work will be done in accordance with the Contract Documents. "FAILURE TO COMPLY WITH THE REQUIREMENTS OF THIS INVITATION TO BID WILL RESULT IN THE DISQUALIFICATION OF THE BIDDER". This contract calls for the construction of a "public work," within the meaning of the Illinois Prevailing Wage Act, 820 ILCS 130/.01 et seq. ("the Act"). The Act requires contractors and subcontractors to pay laborers, workers and mechanics performing services on public works projects no less than the "prevailing rate of wages" (hourly cash wages plus fringe benefits) in the county where the work is performed. For information regarding current prevailing wage rates, please refer to the Illinois Department of Labor's website at: https://www2.illinois.gov/idol/Laws-Rules/CONMED/Pages/Rates.aspx. All contractors and subcontractors rendering services under this contract must comply with all requirements of the Act, including but not limited to, all wage, notice and record keeping duties. Adlai E. Stevenson High School District 125 and Gilbane Building Company reserve the right to reject any or all bids. All information submitted as part of this process shall be considered public information under the State Freedom of Information Act unless specifically disclosed on the applicable information by the Bidder. Challenges to such exemptions shall be defended solely by the Bidder. Published in Daily Herald December 12, 2020 (4555736) , posted 12/12/2020
Bid Protests Not Available