In general, the work shall include but not be limited to: removal and disposal of existing concrete patio, existing trees, existing tree stumps, existing landscaping, and existing sidewalk; furnishing and installing permeable pavers, 15-gallon street trees, and 5-gallon shrubs; furnishing and installing bus stop shelter and accessories (solar powered LED illumination, metal bench, and metal trash receptacle); furnishing and installing irrigation system (at 745 N. Sanborn Rd.); furnishing and installing trash and recycling receptacles; refurbishing and painting existing City benches; furnishing and installing regulatory and guide signs; 90-day Type 2 plant establishment period; mobilization; construction best management practices; traffic control; and all incidental and appurtenant improvements and restorations specified on the Plans and herein these Special Provisions.
Bid Protests Not Available