The North American Industry Classification Standard (NAICS) is 237130 and the annual size standard is $39.5
million.
This procurement is for the design-bid-build (DBB) construction of Military Construction (MCON) project P447 Dry Dock 4 & Pier 3 Modernization at Naval Base Kitsap (NBK), Puget Sound Naval Shipyard (PSNS), Bremerton, WA.
This procurement uses the source selection procedures in accordance with FAR Part 15, and will be solicited
utilizing unrestricted full and open competition in accordance with FAR 6.1.
Notice to Large firms: a subcontracting plan is required prior to award.
Source Selection procedures will be used with the intent to award a firm-fixed-price construction
contract to the responsible Offeror whose proposal, conforming to the Request for Proposal (RFP),
offers the lowest-priced, technically acceptable option to the Government, using the Lowest-Priced,
Technically Acceptable (LPTA) tradeoff source selection process. The LPTA tradeoff process is being
utilized because it is in the Government’s best interest to consider award to the lowest price,
technically acceptable Offeror.
This project constructs new Electrical Substations 3A, 3B, 3C, SW, NW, NE, and SE including transformers,
switch gear and associated feeders. Alters Dry Dock 4 electrical distribution systems serving nuclear ship
shore power and industrial power; encloses service utility galleries to prevent flooding during docking
operations. Alters Pier 3 electrical distribution system serving nuclear ship electrical shore industrial power;
repairs existing piles. Demolishes Electrical Substations 45, 3A, 3B, 3C.
The project will be located at the Puget Sound Naval Shipyard (PSNS) on NBK Bremerton, WA. The projects
location is in a controlled industrial area (CIA) with heightened security. The estimated total contract price
range, in accordance with DFARS 236.204, is between $25,000,000 and $100,000,000.
See attached Solicitation documents for N44255-20-R-5002.