The principal items of work and approximate quantities are: Implementation of the Erosion and Sediment Pollution Control Plan (A) Rock Construction Entrance 1 EACH (B) Compost Filter Sock (1) 12" Diameter Compost Filter Sock 200 L.F. (2) 18” Diameter Compost Filter Sock 975 L.F. (3) 24” Diameter Compost Filter Sock 165 L.F. (4) 32” Diameter Compost Filter Sock 100 L.F. (C) Compost Filter Sock Outlets 4 EACH Clearing and Grubbing 1 LUMP SUM Dewatering and Diversion and Care of Water 1 LUMP SUM Grading 26,000 C.Y. Twelve (12) Inch Diameter Smooth Interior Corrugated Polyethylene Pipe 40 L.F. Subsurface Drain (A) 12” Perforated Tubing 15 L.F. (B) 12” Non-Perforated Tubing 210 L.F. Chimney/Blanket Drain Drain (A) AASHTO No. 1 Non-Calcareous Course Aggregate 45 TON (B) Filter Fabric 50 S.Y. Bat Gate (A) Twelve (12) Inch Diameter Smooth Interior Corrugated Polyethylene Pipe 10 L.F. (B) Eighteen (18) Inch Diameter Smooth Interior Corrugated Polyethylene Pipe 15 L.F. (C) Steel Bat Gate Attachment 1 EACH Seeding 3.5 ACRE Beginning on the Issue Date, free copies of bid documents can be obtained by going to www.BidExpress.com, PA Department of Environmental Protection.
Bid Protests Not Available